100+ km and several thousand metres of climbing. Long Z2 rides as the base, threshold work for the climbs, sweet spot for cruising pace. A periodised build over 12–16 weeks up to race day.
Aerobic base as the backbone. 3–6 h rides during the build, periodised with recovery.
Threshold intervals and sweet-spot repeats simulate the climbs on race day.
Power-based using Coggan Classic. FTP updates every 6–8 weeks.
88–94 % FTP intervals as an efficiency lever. A high training effect for every hour you invest.
4-week cycles alternating volume and intensity weeks. Recovery as a must.
In the final 4 weeks, long rides matched to your race profile, with climbing intervals.
80% of your training in low zones (Z1/Z2), 20% in high zones (Z4/Z5+). The most effective approach to endurance performance — backed by Seiler (2010) and Stöggl & Sperlich (2014).
4-week blocks: Build → Build → Peak → Recovery. A systematic increase in load all the way to race day, through the Base, Build, Peak and Taper phases.
Training zones calculated with Coggan Classic (Z1–Z7) from your FTP, HRmax and threshold pace. No guesswork — precise targets for every session.
No hidden costs. Cancel any time.